By Dr. Teresa A. Smith
A program can be well designed, fully staffed, and ready to serve young
people. Then summer arrives, or the school year begins, and the plan starts
slipping. Students don’t participate consistently, activities take longer than
expected, staff members interpret the model differently, or families aren’t
responding to communication. By the end of the day, the program everyone
approved is not quite the program participants are receiving.
That does not automatically mean the design was poor. It may mean you
have an implementation gap: the distance between what the program was designed
to do and what daily operations allow it to do. Recognizing that difference
matters because changing the design before understanding the implementation
problem could leave the real issue untouched.
Leaders sometimes respond by rewriting the schedule, adding activities,
or reminding staff to follow the plan. Those actions may help, but first you
need to identify where the gap is forming. Otherwise, you may spend time fixing
something that was never the actual problem.
Look at the program participants
actually experience
Your proposal, handbook, or program plan describes the intended
experience. Implementation is what happens when a student walks through the
door. The first place to look, therefore, is at what students and families are experiencing
rather than what the written plan says should be happening.
Are activities beginning on time? Do staff members have the materials and
preparation they need? Are students grouped in ways that support participation?
Is transportation reducing how long some students can attend? Does the schedule
work for the ages being served?
Observe the full program day, not only the strongest activity. A creative
lesson cannot carry a program if arrival is confusing, transitions consume too
much time, or students spend long periods waiting. Program quality comes from
the complete experience, so look at how the pieces work together.
Separate a people problem from a
system problem
When implementation falls short, staff often receive the blame first.
Sometimes staff members do need more training, coaching, or accountability.
Other times, the system is asking them to carry out a plan that does not fit
the available time, staffing, space, or student needs.
Before concluding that someone is not doing the job, ask whether
expectations are clear and workable. Were staff trained to deliver the
activity, or were they handed materials and expected to figure it out? Do
partners understand their responsibilities, and are the people expected to make
decisions given the authority and information to do so?
A strong design still depends on people having the authority,
information, preparation, and support to carry it out. If those conditions are
missing, replacing an activity or rewriting a schedule may not solve the
problem. You have to determine whether you are looking at an individual
performance issue, a system issue, or some combination of the two.
Treat participation as implementation
information
Enrollment tells you who signed up. Participation tells you whether
students and families are able and willing to keep returning. Looking at
participation patterns can help you identify questions that enrollment numbers
alone cannot answer.
Review who attends, how often they attend, when participation drops, and
which activities appear to keep students engaged. For a summer program, look
beyond total enrollment because registration alone does not show what
participants experienced. A student who registered but rarely attended did not
receive the program as it was designed.
Talk with students and families before deciding why participation is
uneven. The issue may involve transportation, competing responsibilities,
activity choices, communication, or a program experience that does not match expectations.
Do not guess when you can ask.
Use continuous improvement to correct
the right issue
Continuous improvement is not constant change. It is a disciplined
process of comparing the intended program with the program being delivered,
identifying what may be contributing to the difference, making a focused
adjustment, and checking whether that adjustment helped. The purpose is not to
keep changing things simply because everything is not perfect.
Bring together attendance patterns, staff observations, student and
family feedback, partner concerns, and evidence from daily operations. Then
ask:
What did we intend to happen?
What is happening consistently?
Where does the experience change from the plan?
What conditions may be contributing to that difference?
What adjustment can we make without weakening the program’s purpose?
The goal is not to protect the original plan because it looked good on
paper. The goal is to protect the program's purpose while strengthening its delivery.
That requires leaders to pay attention to what implementation is telling them,
even when the information challenges what they originally expected.
A program that needs adjustment is not necessarily failing. The bigger
problem comes when leaders keep defending the design while ignoring what
participants, staff, families, and daily operations show them. Before you
redesign the program, begin with what people are experiencing, where the system
is breaking down, and what the evidence says needs to change.
Need Help Identifying the
Implementation Gap?
If your afterschool or youth program isn’t operating the way it was
designed, changing activities or rewriting the schedule may not address the
real problem. DQ Consulting works with organizations to examine program
implementation, identify where delivery is breaking down, and determine what needs
attention before making major changes.
If your organization needs support assessing what is happening and
determining the next steps, visit the Contact Us page at askdrtas.com and tell
me what is happening in your program.